Fort Hunter Liggett (FHL) - Modernize Potable Water Transmission and Storage Infrastructure
Key Dates
Due Date
-
Posted Date
-
Agency & Value
Agency
W072 ENDIST LOUISVILLE
Contract Value
Not provided
Codes & Classification
Solicitation Number
W912QR-25-PWT-FHL
NAICS
237110 - Water and Sewer Line and Related Structures Construction
Classification Code
-
Additional Details
Documents1
The U.S. Army Corps of Engineers, Louisville District (W072 ENDIST LOUISVILLE), is conducting a market survey to identify qualified small business concerns for a forthcoming Design Build project at Fort Hunter Liggett (FHL), located in Jolon, California. The initiative, titled "Modernize Potable Water Transmission and Storage Infrastructure," seeks to address critical upgrades to the installation’s potable water system, enhancing both reliability and compliance with current fire protection standards.
The scope of work encompasses several major components:
1. **Transmission Line Installation**: The project calls for the installation of a new, dedicated 5.25-mile, 20-inch high-density polyethylene (HDPE) potable water transmission line. This new line will run parallel to the existing, deteriorating 12-inch pipeline, adjacent to a gravel road, with appropriate separation to safeguard both the new and existing infrastructure during construction and future maintenance. The HDPE line is designed to improve system resiliency, offering increased flow and pressure, and utilizing fusion-welded joints to mitigate risks associated with thrust forces.
2. **Storage Tank Construction**: Two new storage tanks, with a combined capacity of 2.06 million gallons, will be constructed along a ridge at an elevation of 1,250 feet above FHL. The design incorporates recommendations from the Jacobs Engineering Design Analysis Report (May 30, 2024) and allows for future expansion. These tanks will replace the existing 1.2 million-gallon facility, ensuring compliance with National Fire Protection Association (NFPA) and California Fire Suppression standards, which require a minimum of 2.0 million gallons of storage.
3. **Access Road Development**: A 4,500-foot access road will be built to facilitate entry to the new storage tank site. The design, informed by geotechnical analysis, limits the road grade to a maximum of 10% to maintain vehicle traction during wet conditions, a constraint reflected in the project’s cost estimate.
4. **Well Facility Upgrades**: The project includes modernization of existing potable water source well facilities, encompassing upgrades to ancillary equipment and building repairs. Specific improvements will address chemical feed systems, HVAC, life safety, security, SCADA controls, and backup power systems.
The anticipated contract duration is 540 calendar days, with an estimated cost range between $25 million and $100 million. The procurement is classified under NAICS code 237110 (Water and Sewer Line and Related Structures Construction), and the government is specifically seeking responses from Small Businesses, HUBZone, 8(a), Woman-Owned Small Businesses, and Service-Disabled Veteran-Owned Small Businesses.
**Key Requirements and Submission Details:**
- Respondents must verify their small business status and provide their Unique Entity Identifier (UEI).
- Firms must submit documentation from their bonding company indicating current single and aggregate performance and payment bond limits.
- Experience documentation is required for up to three relevant projects completed as a prime contractor (or, for small businesses, past performance of affiliates per DFARS 215.305(a)(2)(C)). Projects should be at least 90% complete or finished within the last five years, and similar in scope and complexity—specifically, projects involving replacement of water supply systems, transmission lines, tanks, pumps, wells, ancillary facilities, and access roads. Projects should also be similar in size, featuring a minimum of 4 miles of 18-inch or larger potable water transmission line and a storage tank of at least 1.5 million gallons.
- For each project, firms must detail the percentage of construction complete, completion date, project size (including lineal footage, tank and building sizes), scope, contract value, percentage of self-performed work, delivery method (design build or design/bid/build), and the number of subcontractors by trade. References for each project must be provided.
- Small businesses must comply with FAR 52.219-14, performing at least 15% of the contract cost (excluding materials) with their own employees.
- Responses must be submitted exclusively via the designated survey form (https://forms.osi.apps.mil/r/WMxJ4gi0Lf); no other transmission methods will be accepted. Capability statements should be limited to the space provided in the form.
**Additional Considerations:**
- This notice is a sources sought announcement, not a Request for Proposal, and does not obligate the government to any contractual commitment. Responses will inform acquisition strategy and set-aside decisions.
- All contractors must be registered in the System for Award Management (SAM.gov) prior to contract award, with a valid UEI. The registration process includes submission of a notarized letter appointing the authorized Entity Administrator, which is mandatory for both new and existing entities.
- Contractors are strongly encouraged to begin the SAM registration process promptly to avoid delays in potential contract awards.
**Contact Information:**
- Contracting Entity: U.S. Army Corps of Engineers, Louisville District (W072 ENDIST LOUISVILLE)
- Primary Contact: Adam Brooks ([email protected])
- Place of Performance: Jolon, California, USA
Interested and qualified small business contractors should carefully review the requirements and submit their responses by 3:00 PM Eastern Standard Time on Friday, December 5, 2025. For further details and access to the market survey form, refer to the official SAM.gov posting at https://sam.gov/opp/51084af0b04c4852b6fbc930d65a1ee5/view.
This opportunity represents a significant infrastructure modernization effort, requiring demonstrated expertise in large-scale water transmission and storage projects, as well as the ability to self-perform a substantial portion of the work. Contractors with relevant experience and capacity are encouraged to participate in this market survey to help shape the future solicitation.