Plating Shop Renovation Industry Day

Key Dates
Due Date

-

Posted Date

-

Agency & Value
Agency

W075 ENDIST SACRAMENTO

Contract Value

Not provided

Codes & Classification
Solicitation Number

-

NAICS

236210 - Industrial Building Construction

Classification Code

Z2EZ

Additional Details
Set Aside

None

Place of Performance

Layton, Utah, UNITED STATES

SourceSAM
Documents1
The U.S. Army Corps of Engineers (USACE), Sacramento District, is announcing an Industry Day for the upcoming Plating Shop Renovation project at Hill Air Force Base (AFB), Utah. Sponsored by the U.S. Air Force and executed by USACE’s Utah Satellite Office, this initiative aims to modernize and expand the plating shop facilities in Buildings 505 and 507, ensuring the continued capability for depot-level maintenance of multiple aircraft platforms. The project is classified under NAICS code 236210 (Industrial Building Construction) and Product Service Code Z2EZ, with an estimated construction magnitude between $100 million and $250 million. The primary objective of this procurement is to deliver a comprehensive renovation of approximately 20,000 square feet of existing shop space and construct a new 2,800-square-foot Pre-Engineered Metal Building (PEMB) adjacent to Building 505. The renovation will address critical compliance with OSHA and environmental standards, enhance safety and ergonomics, improve energy efficiency, and reduce maintenance costs. Ultimately, the project will provide a robust, modernized facility to support reliable aircraft part finishing operations, directly contributing to Air Force readiness. Key requirements for the renovation include significant structural upgrades—such as reinforcing basement slabs, footings, and CMU walls, replacing structural platforms and columns, and modifying the roof structure to support overhead cranes. Mechanical and process system improvements will involve replacing HVAC and ventilation systems for chemical processes, as well as refurbishing chemical-resistant coatings throughout the facility. Electrical and controls work will upgrade panelboards, busways, circuits, instrumentation, and lighting to support automated, traceable plating operations. Fire and life safety enhancements will include updated fire suppression systems, emergency eyewash and shower stations, and improved life safety signage. The new PEMB will be constructed to house ovens that extend beyond the current building footprint. This structure will feature insulated steel panels, a standing seam metal roof, polyisocyanurate insulation, and snow guards. The design also includes a cast-in-place basement, equipment platforms, steel stairs, and service utility routing, with a structural opening and expansion joint to ensure seamless integration with Building 505. The project will be delivered using a Design-Bid-Build (DBB) approach under a Firm-Fixed Price (FFP), Single Award Task Order Contract (SATOC). The ordering period spans 1,825 calendar days (five years), accommodating a phased construction schedule and the complexity of equipment installation, testing, and commissioning. Each phase of work will be executed under a separate, pre-priced task order, with bonding required at the task order level for awarded or active work only. The phased construction approach is as follows: - **Phase 1:** Demolition of the 'A' tank line in B507 and ovens in B505; installation of Type II Anodize (B507) and Chrome, Type III Anodize, Phosphate/Passivate (B505). - **Phase 2:** Demolition of Chrome, Anodize, and Phosphate lines; installation of Cadmium, Zinc Nickel, Temper Etch, Nickel, and Electroless Nickel lines. - **Phase 3:** Demolition of Cadmium, Iridate, Zinc Nickel, Temper Etch, and Nickel lines; installation of Chrome Strip, Fluorescent Penetrant Inspection (FPI), Degrease, and future lines. - **Phase 4:** Demolition of Chrome and FPI lines; installation of a new Chrome tank line. The facility will support a range of plating processes, including Electroless Nickel, Cadmium Plating, Chrome and HVOF Strip, Chrome Plating, Anodize/Alodine (Type II & III), Zinc Nickel Plating, Nickel Sulfamate Plating, Phosphate/Temper Etch/Passivate, Aluminum Conversion Coat, Titanium Pickle, FPI, and Aqueous Degrease. Contractors should note that all work will occur within active, secure facilities. This necessitates strict adherence to security protocols, protection of government property, provision of dust enclosures, and close coordination with ongoing operations to minimize disruption. The Industry Day is scheduled for Friday, November 7, 2025, with a briefing from 0900 to 1100 MDT at the USACE Utah Layton Satellite Office (523 S. Heritage Park Blvd, Suite 1, Layton, UT 84041), followed by a site visit at Building 505, Hill AFB, from 1300 to 1430 MDT. Key USACE staff—including the Project Manager, Technical Lead, Discipline Design Leads, Environmental Leads, and Contracting Officers—will be available to present project requirements, answer questions, and facilitate networking. Interested parties are required to RSVP by 1200 PDT on October 22, 2025, providing their full name, company name, and email address. RSVPs should be sent to Melita S. Doyle ([email protected]) and Amelia K. Bryant ([email protected]). This opportunity is managed by W075 ENDIST SACRAMENTO, a federal office of the U.S. Army Corps of Engineers. The place of performance is Layton, Utah, at Hill Air Force Base. The procurement is currently active and further details, including attachments, can be accessed via the official SAM.gov posting (Opportunity ID: c1faaaf9b2804b3f9cc79ba18ad33446). Contractors with experience in large-scale industrial building construction, complex phased renovations, and secure facility operations are encouraged to evaluate this opportunity in alignment with their capabilities and to participate in the Industry Day for further insight into the project’s scope and requirements.