Paint Exteriors of warehouses

Key Dates
Due Date

-

Posted Date

-

Agency & Value
Agency

DLA DISTRIBUTION

Contract Value

Not provided

Codes & Classification
Solicitation Number

SP3300-16-B-0016

NAICS

238320 - Painting and Wall Covering Contractors

Classification Code

Z

Additional Details
Set Aside

SBA

Place of Performance

TRACY

SourceSAM
<span style="mso-bookmark: OLE_LINK1">Contractor shall provide all labor, materials, equipment, supplies and supervision to perform the following work: Paint Exteriors of warehouses 14, 15, 17 and 18, DLA Distribution San Joaquin CA (DDJC), Tracy Site, 25600 South Chrisman Rd, Tracy, CA 95304.</span> <p><span style="mso-bookmark: OLE_LINK1">The following summary of work is for the purpose of general information and is not intended to include and describe every feature or item or to define the scope of work.<span style="mso-spacerun: yes">&nbsp; </span>It is expected that the contractor will visit the site of work and thoroughly familiarize himself with the conditions existing there.<span style="mso-spacerun: yes">&nbsp; </span>Failure on the part of the contractor to acquaint himself with the site conditions will not be sufficient reason for any increase in contract price.</span></p> <p><span style="mso-bookmark: OLE_LINK1">&nbsp;</span></p> <p style="MARGIN-LEFT: 5pt; TEXT-INDENT: -28.85pt; mso-list: l0 level1 lfo1"><span style="mso-bookmark: OLE_LINK1"><span style="FONT-SIZE: 11pt; FONT-FAMILY: "><span>&bull;1.<span style="FONT: 7pt ">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </span></span></span>Project Description: This project is required to repaint the exterior surfaces of four warehouses including surface preparation, primer (where required), and finish coats of paint. The project includes the following work:</span></p> <p><span style="mso-bookmark: OLE_LINK1">&nbsp;</span><span style="mso-bookmark: OLE_LINK1"><span style="FONT-SIZE: 11pt; FONT-FAMILY: "><span>&bull;a.<span style="FONT: 7pt ">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </span></span></span>Repaint concrete walls, exposed metal gas piping, exposed metal piping, metal gutters, metal downspouts, louvers, metal railings and dock stairs, wood dock bumpers, wood trims, wood doors, metal siding, metal pipe bollards, metal ladders, metal personnel doors and frames, metal trims, wooden cargo doors, wood window frames, canopies, and sprinkler system piping under canopies.<br /></span><span style="mso-bookmark: OLE_LINK1"><span style="FONT-SIZE: 11pt; FONT-FAMILY: "><span><br />&bull;b.<span style="FONT: 7pt ">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </span></span></span>Repaint sliding and roll-up cargo doors, except those identified on the drawings.<br /></span><span style="mso-bookmark: OLE_LINK1"><span style="FONT-SIZE: 11pt; FONT-FAMILY: "><span><br />&bull;c.<span style="FONT: 7pt ">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </span></span></span>Repaint fire department connections (FDC) markings with red paint (4" wide lines and FDC lettering).<br /></span><span style="mso-bookmark: OLE_LINK1"><span style="FONT-SIZE: 11pt; FONT-FAMILY: "><span><br />&bull;d.<span style="FONT: 7pt ">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </span></span></span>Replace damaged caulking and sealant.<br /></span><span style="mso-bookmark: OLE_LINK1"><span style="FONT-SIZE: 11pt; FONT-FAMILY: "><span><br />&bull;e.<span style="FONT: 7pt ">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </span></span></span>Replace abrasive strips on concrete dock stairs.<br /></span><span style="mso-bookmark: OLE_LINK1"><span style="FONT-SIZE: 11pt; FONT-FAMILY: "><span><br />&bull;f.<span style="FONT: 7pt ">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </span></span></span>Remove and dispose of lead-based paint, as required from surface preparation.</span></p> <p><span style="mso-bookmark: OLE_LINK1">&nbsp;</span><span style="mso-bookmark: OLE_LINK1">All work shall be performed complete and in accordance with the specifications, drawings and solicitation requirements.<br /></span><span style="mso-bookmark: OLE_LINK1"><br />Period of Performance:<span style="mso-spacerun: yes">&nbsp; <br /></span></span><span style="mso-bookmark: OLE_LINK1">Contractor shall commence work upon receipt of the Notice to Proceed (NTP) and complete the entire work ready for use within 240 calendar days from receipt of the NTP.</span></p> <p><span style="mso-bookmark: OLE_LINK1">&nbsp;</span><span style="mso-bookmark: OLE_LINK1">The work to be performed shall be during the regular working hours. <span style="mso-spacerun: yes">&nbsp;</span>Contractor's working hours, which do not require a power outage, will coincide with working hours of DDJC, a normal five (5) day, forty (40) hour week, Monday through Friday, from 7:00 A.M. to 3:30 P.M., except Federal holidays.<span style="mso-spacerun: yes">&nbsp; </span>Federal holidays are those days officially observed by the Federal Government.<span style="mso-spacerun: yes">&nbsp; </span>Saturday holidays are observed on the preceding Friday and Sunday holidays the following Monday.<span style="mso-spacerun: yes">&nbsp; </span>New Year's Day, Martin Luther King Day, President's Day, Memorial Day, July Fourth, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day, Christmas Day, and any other day as may be declared by the President to be a Federal holiday.</span></p> <p><span style="mso-bookmark: OLE_LINK1">This acquisition is set-aside 100% for Small Business concerns.</span></p> <p><span style="mso-bookmark: OLE_LINK1">The NAICS Code for this procurement is 238320.<span style="mso-spacerun: yes">&nbsp; </span>The small business size standard is $15,000,000.</span></p> <p><span style="mso-bookmark: OLE_LINK1">The magnitude of this construction effort is between $1,000,000.00 and $5,000,000.00.</span></p> <p><span style="mso-bookmark: OLE_LINK1">The tentative timeframe for issuance of Invitation for Bid (IFB) SP3300-16-B-0016 for the above stated requirement is on or around July 28, 2016.<span style="mso-spacerun: yes">&nbsp; </span>A pre-proposal/site visit will be conducted.<span style="mso-spacerun: yes">&nbsp; </span>The exact date and time for the pre-proposal/site visit will be stated in the solicitation package.<span style="mso-spacerun: yes">&nbsp; </span>The solicitation will also establish the bid opening date and time.</span></p> <p><span style="mso-bookmark: OLE_LINK1">Access to the solicitation package to include the specifications and drawings will only be made available to prospective offerors via the Federal Business Opportunities (FedBizOpps) website at http: </span><a href="http://www.fbo.gov"><span style="mso-bookmark: OLE_LINK1">www.fbo.gov</span></a><span style="mso-bookmark: OLE_LINK1">.<span style="mso-spacerun: yes">&nbsp; </span>Hard copies of the solicitation will not be distributed.<span style="mso-spacerun: yes">&nbsp; </span></span></p> <p><span style="mso-bookmark: OLE_LINK1">Any questions concerning this project should be directed to the Acquisition Specialist Mogen Gilson at </span><a href="mailto:[email protected]"><span style="mso-bookmark: OLE_LINK1">[email protected]</span></a><span style="mso-bookmark: OLE_LINK1">.<span style="mso-spacerun: yes">&nbsp; </span>All questions should be submitted in writing via email to the above.</span></p> <p><span style="mso-bookmark: OLE_LINK1">Prospective offerors are cautioned concerning their responsibility to access the website for any amendments that may be issued under the IFB.<span style="mso-spacerun: yes">&nbsp; </span>There will be no advance notification of amendment issuance.<span style="mso-spacerun: yes">&nbsp;&nbsp; </span>Prospective offerors are advised to consult the website frequently to check for any amendments.<span style="mso-spacerun: yes">&nbsp; </span>Amendments may be issued up until the bid opening date.<span style="mso-spacerun: yes">&nbsp; </span>Failure to acknowledge amendments may render your bid ineligible for award.</span></p> <p><span style="mso-bookmark: OLE_LINK1">All offerors MUST be registered in the System for Award Management (SAM) Database at http://www.sam.gov or an award cannot be processed. The solicitation will identify all information that the prospective offeror must submit in order to be considered for award. Failure to submit all the information requested by the solicitation may result in the bid being eliminated from consideration for award.</span></p> <p><span style="mso-bookmark: OLE_LINK1">All responsible small business concerns may submit a bid which shall be considered by this agency.<span style="mso-spacerun: yes">&nbsp; </span></span>The Government intends to award one contract as a result of this IFB.<span style="mso-spacerun: yes">&nbsp; </span>Award will be made to the lowest responsive, responsible bidder.<span style="mso-spacerun: yes">&nbsp; </span>An offeror must be determined responsible according to the standards of FAR Subpart 9 to be eligible for award.</p>