CUSTER GALLATIN NATIONAL FOREST - West Fork Beaver Creek Trail #222 Flood Repair

Key Dates
Due Date

-

Posted Date

-

Agency & Value
Agency

CUSTER GALLATIN NATIONAL FOREST

Contract Value

Not provided

Codes & Classification
Solicitation Number

1240LU25R0009

NAICS

237990 - Other Heavy and Civil Engineering Construction

Classification Code

Y1PA

Additional Details
Set Aside

SBA

Place of Performance

Montana, UNITED STATES

SourceSAM
The Custer Gallatin National Forest is soliciting proposals for the West Fork Beaver Creek Trail #222 Flood Repair project, located within the Madison Mountain Range in Montana. This procurement seeks qualified contractors to hand-construct approximately 560 feet of new, 72-inch-wide, full-bench stock trail through two avalanche-damaged ravines situated in a non-motorized wilderness area. The project is necessitated by significant flood damage and aims to restore safe, sustainable trail access in a challenging, environmentally sensitive setting. The scope of work involves extensive manual and mechanical labor, including the use of picks, rock bars, jackhammers, and drilling and blasting equipment. Contractors will be required to perform repeated surface and subsurface drilling and blasting to establish the trail bench and remove excess material from the backslope and hillside above the trail. The terrain is characterized by extremely steep slopes, loose soils, eroding rock cliffs, outcroppings, and bedrock, demanding specialized expertise in trail construction under rugged wilderness conditions. The finished trail must be cut down to solid subsurface material to ensure long-term durability, with backslope ratios specified at 4:3 in mixed material and 5:2 in rock. The estimated volume of material to be excavated is approximately 962 cubic yards. The project site is located about 22 miles northwest of West Yellowstone, Montana. Access is via Highway 191 north from West Yellowstone, then west on Highway 287, and finally north on Beaver Creek Road #985 to the West Fork Beaver Creek trailhead. Given the remote and non-motorized wilderness designation, all work must comply with applicable environmental and access restrictions. The magnitude of construction is estimated between $250,000 and $500,000, as defined by FAR 36.204(b). This solicitation is set aside for SBA-eligible contractors, and all offerors must provide a 20% bid bond with their proposal submissions. The successful contractor will be required to furnish 100% performance and payment bonds. There is no formal site visit scheduled; however, vendors are strongly encouraged to visit the site independently to assess conditions. For site-specific questions or to clarify directions and current conditions, interested parties may contact Todd Orr, Engineer Tech, at 406-587-6741 or [email protected]. The contracting entity is the Custer Gallatin National Forest, a federal office, with Alisha Knaub serving as the primary point of contact ([email protected], 406-438-2981). The procurement is classified under NAICS code 237990 (Other Heavy and Civil Engineering Construction) and Product Service Code Y1PA. The place of performance is Montana, United States. Interested contractors should review all solicitation documents and attachments available on SAM.gov (Opportunity ID: 5cd4a7b8629147989878a959ac27c698) and submit their responses by June 16, 2025. This opportunity is well-suited for firms with demonstrated experience in wilderness trail construction, rock excavation, and compliance with federal bonding and set-aside requirements.
Documents7