Berlin Lake Sewer Treatment Plant Replacement
Key Dates
Due Date
-
Posted Date
-
Agency & Value
Agency
W072 ENDIST PITTSBURGH
Contract Value
Not provided
Codes & Classification
Solicitation Number
W911WN25BA011
NAICS
237110 - Water and Sewer Line and Related Structures Construction
Classification Code
Y1PD
Additional Details
Documents4
The U.S. Army Corps of Engineers (USACE), Pittsburgh District, has issued a solicitation for the replacement of the Berlin Lake Sewer Treatment Plant, located at Berlin Lake in Berlin Center, Pennsylvania. This project aims to replace the existing Wastewater Treatment Facility (WWTF) that currently serves USACE campgrounds and two field offices. The new facility will be constructed adjacent to the existing plant, ensuring uninterrupted wastewater treatment services throughout the project duration.
The scope of work encompasses a comprehensive upgrade and replacement of the WWTF, with the following key objectives and deliverables:
- Installation of a new, prefabricated pump station and force main line.
- Construction of a new, prefabricated WWTF rated at 30,000 gallons per day (gpd), utilizing the extended aeration process. The facility may include features such as a trash trap, flow equalization, aeration, clarifier, sludge holding and dosing tanks, fixed media and surface sand filtration, and UV disinfection.
- Renovation of the existing WWTF control and laboratory building.
- Additional lead and asbestos testing and remediation, as required.
- Upgrading the existing power supply to meet local utility requirements and installation of a dedicated automatic emergency power generator.
- Construction of a gravel driveway for access and parking, installation of lighting, and security fencing/gates.
- Reconfiguration of portions of the existing sanitary sewer piping to accommodate the new hydraulic profile.
- Site grading, implementation of best management practices for erosion and sediment control, and final restoration and landscaping with Ohio native plant species.
- Compliance with the Ohio Environmental Protection Agency (OEPA) Permit-to-Install (PTI) requirements, as the permit for the new WWTF has already been secured by the Government.
- Seamless switchover from the existing WWTF to the new facility, followed by demolition and proper disposal of the old WWTF and its appurtenances.
- OEPA-licensed operator startup and operation of the new WWTF for a limited duration, including training for Government or other designated operators.
The project is scheduled to begin with the submittal and fabrication process in 2025, with physical construction and restoration anticipated to occur from October 2025 through October 2026. The contract closeout is expected before the end of 2026. Throughout the contract period, campground usage and operations will remain unchanged, and continuous access and utility services must be maintained for the existing WWTF until the new facility is fully operational.
All construction waste and materials must be disposed of at commercially permitted facilities licensed to accept such waste or recyclable materials. The total period of performance is 720 calendar days from the issuance of the Notice to Proceed.
This procurement is classified under NAICS Code 237110 (Water and Sewer Line and Related Structures Construction), with a small business size standard of $45,000,000.00. The estimated magnitude of construction is between $1,000,000.00 and $5,000,000.00. The acquisition will be conducted as Full and Open Competition, resulting in a single Firm-Fixed-Price (FFP) contract. All responsible bidders are encouraged to participate.
Interested contractors must be registered and maintain active status in the System for Award Management (SAM) and the Procurement Integrated Enterprise Environment (PIEE) Solicitation Module with the Proposal Manager role. Registration in SAM.gov and PIEE is mandatory for bid submission and contract award. The solicitation will be issued online via PIEE and posted to SAM.gov; hardcopies will not be provided.
The contracting entity for this opportunity is W072 ENDIST PITTSBURGH, a federal office of the USACE. The primary point of contact is Aaron M. Barr ([email protected], 412-395-7157), with secondary contact Connie L. Ferguson ([email protected], 412-395-7551).
Amendments to the solicitation have been issued to update wage determinations and correct solicitation details. Bid opening is scheduled to be held online, with attendance and results posted accordingly.
For further details, including registration instructions and access to solicitation documents, contractors should refer to the official notice at https://sam.gov/opp/2bade2314ab3423893161a1cd69cd591/view.
This opportunity is well-suited for contractors with expertise in water and sewer line construction, wastewater treatment facility installation, and related site development and environmental compliance. The project requires careful coordination to ensure continuous service, regulatory compliance, and high standards of safety and environmental stewardship throughout the contract lifecycle.