GSU Transformer Supply, Oahe Dam, SD & Ft Peck Dam, MT

Key Dates
Due Date

-

Posted Date

-

Agency & Value
Agency

W071 ENDIST OMAHA

Contract Value

Not provided

Codes & Classification
Solicitation Number

W9128F25RA053

NAICS

335311 - Power, Distribution, and Specialty Transformer Manufacturing

Classification Code

6120

Additional Details
Set Aside

SBA

Place of Performance

Fort Pierre, South Dakota, UNITED STATES

SourceSAM
The U.S. Army Corps of Engineers, Omaha District (W071 ENDIST OMAHA), under the Department of Defense, has issued an award notice for the supply of Generator Step-Up (GSU) transformers at two major hydroelectric facilities: Oahe Dam in South Dakota and Fort Peck Dam in Montana. This procurement, identified by W9128F25RA053, is classified under NAICS Code 335311, which pertains to Power, Distribution, and Specialty Transformer Manufacturing, and Product Service Code 6120. The opportunity is set aside for SBA-qualified entities, emphasizing the government’s commitment to supporting small business participation. The scope of this contract encompasses the comprehensive design, manufacturing, testing, and delivery of GSU transformers and associated ancillary and control components for both sites. Specifically, the Fort Peck Dam project involves the supply of two new GSU transformers (units 4 and 5) for switchyard #2, while the Oahe Dam project requires the supply of ten new GSU transformers. For each location, the contractor is responsible for: - Designing and manufacturing the specified GSU transformers and all necessary ancillary and control components. - Conducting Factory Acceptance Testing (FAT) to ensure quality and compliance prior to shipment. - Delivering the transformers to the respective power plants, including offloading at temporary storage and staging areas. - Reassembling the transformers, performing oil processing and filling, and relocating them to their final operating positions as coordinated with a separate installation contractor. - Completing final acceptance testing and commissioning after the transformers are interconnected to the power plants by the installation contractor. The place of performance for this contract is Fort Pierre, South Dakota, with the work ultimately supporting operations at both Oahe and Fort Peck Dams. The contracting office is a federal entity, specifically the Omaha District of the U.S. Army Corps of Engineers, and the primary points of contact for this procurement are Brandie Murphy ([email protected]) and Marc Proietto ([email protected]). This procurement is active and was posted on February 20, 2026. Contractors interested in this opportunity should note the technical requirements for transformer manufacturing, testing, and logistics, as well as the coordination necessary with other contractors for installation and commissioning. The contract is structured to ensure the delivery of high-quality, reliable transformers that are critical to the continued operation and modernization of these hydroelectric facilities. For further details and updates, contractors are encouraged to visit the official notice at https://sam.gov/opp/bf258e856bcc489f94af379fde8194f7/view. This opportunity represents a significant project for qualified manufacturers specializing in power and distribution transformers, with a focus on robust deliverables and compliance with federal standards throughout the contract lifecycle.