DISASTER RESILIENCY PROGRAM PHASE 2, CREECH AFB, NEVADA
Key Dates
Due Date
-
Posted Date
-
Agency & Value
Agency
W075 ENDIST LOS ANGELES
Contract Value
Not provided
Codes & Classification
Solicitation Number
W912PL25RA012
NAICS
236220 - Commercial and Institutional Building Construction
Classification Code
Y1BZ
Additional Details
The U.S. Army Corps of Engineers, Los Angeles District (W075 ENDIST LOS ANGELES), has announced the award of a major design-build construction contract under the Disaster Resiliency Program Phase 2 at Creech Air Force Base, Nevada. This initiative is a critical component of the base’s ongoing efforts to enhance operational resilience and mission readiness in the face of potential disasters.
The scope of work encompasses the design and construction of a comprehensive Aircraft Maintenance Facility (AMF) complex and associated infrastructure. Key deliverables include a 79,335 square foot AMF hangar featuring two large flow-through bays with horizontal sliding pocket doors, a 4,429 square foot covered Aerospace Ground Equipment (AGE) storage yard, a 204 square foot hazardous material storage area, and 100,167 square feet of airfield pavements. The AMF hangar will be constructed with a reinforced concrete foundation and floor slab, a structural steel frame, metal panel with brick veneer exterior, and a standing seam metal roof system. The facility will be equipped with anti-skid floor coatings, a water sprinkler fire suppression system, aircraft static grounding points, and robust exhaust and ventilation systems to support aircraft operations, including taxiing under their own power.
Security and resilience are central to the project’s objectives. The AMF and AGE storage yard will incorporate advanced physical and electronic security measures, including intrusion detection systems (IDS), access control systems (ACS), closed-circuit television (CCTV), security lighting, and integrated security fencing and gates. The facility will also be designed to meet Department of Defense (DoD) requirements for secure work areas, with construction in accordance with ICD/ICS 705 standards for mission-essential primary facilities. Cybersecurity measures for facility-related control systems are also mandated.
Supporting infrastructure includes the construction of light-load airfield pavements—comprising concrete hangar access aprons, apron access taxiways, and paved shoulders (asphalt)—as well as comprehensive site preparation, stormwater management, electrical and airfield lighting systems, communications, water and sewer utilities, utility connection fees, and fire detection and suppression systems. The project is authorized to include emergency generators with fuel tanks and automatic transfer switches for each mission-essential facility, ensuring operational continuity during power disruptions.
All facilities will be designed as permanent structures in accordance with the latest DoD Unified Facilities Criteria (UFC), including UFC 1-200-01 (General Building Requirements), UFC 1-200-02 (High Performance and Sustainable Building Requirements), UFC 4-211-01 (Aircraft Maintenance Hangars), and UFC 3-260-02 (Pavement Design for Airfields). Compatibility with DoD, Air Force, and base design standards is required, and the use of local materials and construction techniques is encouraged where cost-effective. The project must also comply with DoD antiterrorism and force protection requirements.
A notable requirement is the mandatory use of a Project Labor Agreement (PLA) in accordance with Executive Order 14063 for large-scale federal construction projects exceeding $35 million. Offerors must submit a complete, signed PLA with their proposals, as stipulated by FAR 52.222-33 and FAR 52.222-34. Failure to comply may result in ineligibility for award.
The procurement is classified under NAICS code 236220 (Commercial and Institutional Building Construction) and Product Service Code Y1BZ. The estimated magnitude of construction is between $100,000,000 and $250,000,000. The contract will be awarded as a Firm-Fixed-Price Design-Build agreement, with a performance period of 730 calendar days from the Notice to Proceed. The solicitation is issued as Full and Open Competition, with no set-aside for small businesses.
The selection process follows a one-phase design-build procedure under 10 USC 2842 and ECB 2019-14, utilizing Best Value Trade Off methods in accordance with FAR 15. Both technical and price proposals are required, with evaluation factors including past performance, technical approach, management structure, schedule, and small business participation.
Interested contractors must be registered in the System for Award Management (SAM) and, in the case of joint ventures, the JV entity must also be registered as a distinct business entity. Access to solicitation documents is restricted; eligible offerors must contact the designated points of contact and provide their CAGE code for vetting. All solicitation materials and amendments will be posted exclusively on https://sam.gov/, and contractors are responsible for monitoring the site for updates.
For further information, the primary point of contact is Dominic Pebenito ([email protected]), with RubyAnn S. Prout ([email protected]) as the secondary contact.
This opportunity represents a significant undertaking for qualified contractors with experience in large-scale, secure, and resilient military facility construction, offering the chance to contribute to the long-term operational effectiveness of Creech Air Force Base.