HEMP Protected Fiber Optic Cable System

Key Dates
Due Date

-

Posted Date

-

Agency & Value
Agency

TELECOMMUNICATIONS DIVISION- HC1013

Contract Value

Not provided

Codes & Classification
Solicitation Number

HC101318R0016

NAICS

-

Classification Code

D

Additional Details
Set Aside

None

Place of Performance

Cheyenne mountain AFS

SourceSAM
<span style="FONT-SIZE: 10pt; FONT-FAMILY: ">To provide network/system/service and equipment terminating at the 3 bases, that have the capability of supporting Wave Division Multiplexing (WDM); and have the ability to provide the initial two lambda services with working and protected paths in opposite directions and at least two additional capacity of OC-48 wavelengths terminating at each location with no electronic breakouts outside of the terminating HEMP facilities at the 3 bases.<span style="mso-spacerun: yes">&nbsp; </span>This requirement is part of the Colorado Springs Survivable Communications Network.&nbsp;&nbsp;&nbsp; <br /><br />This PWS and the associated system specifications/requirements identified in this PWS</span><span><span style="FONT-SIZE: 8pt; FONT-FAMILY: "> </span></span><span style="FONT-SIZE: 10pt; FONT-FAMILY: ">establish the requirements and quality assurance provisions for a contractor to provide, operate, and maintain HEMP protected fiber optic links between CMAFS, PAFB and SAFB.<span style="mso-spacerun: yes">&nbsp; </span>The government's initial requirement is for the Contractor to activate two wavelengths equipped with OC-48, Intermediate Reach (IR), single mode fiber interfaces with no electronic breakouts outside of identified HEMP protected shelters/terminating locations.<span style="mso-spacerun: yes">&nbsp;&nbsp; <br /></span><br />The network shall provide local, stand-alone, services capable of sustained operation during the presence of the threats encountered by the Command and Control facilities at SAFB, PAFB and CMAFS.<span style="mso-spacerun: yes">&nbsp; </span>The network shall employ path diversity, communications site dispersal and modern systems (technical control) techniques. This PWS is for 2 OC-48 lambda services at each location constituting a system with a working and protected path in opposite directions.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </span>
Documents21