Request for Information (RFI) Title: Mounted Mission Command (MMC) Mounted Family of Computer Systems (MFoCS) Block III Market Research Questionnaire for Industry Comment
Key Dates
Due Date
-
Posted Date
-
Agency & Value
Agency
W6DR PEO C3N
Contract Value
Not provided
Codes & Classification
Solicitation Number
MC_20240312_RFI_MFoCS_BlockIII
NAICS
-
Classification Code
-
Additional Details
Documents1
The U.S. Army, through the Program Executive Office Command, Control, Communications, Computers, and Networks (PEO C3N), is conducting market research to inform the future acquisition strategy for the Mounted Family of Computer Systems (MFoCS) Block III. This Request for Information (RFI), issued under procurement identifier MC_20240312_RFI_MFoCS_BlockIII, seeks industry feedback on technical and production capabilities related to the modernization of tactical computing hardware for Army ground vehicles.
Purpose and Scope:
The MFoCS program provides modular, ruggedized computing solutions installed in tactical and combat ground vehicles, supporting mission command interoperability. The current Block I and II systems utilize scalable Line Replaceable Units (LRUs) for processing and display, designed for incremental upgrades and compatibility with existing vehicle infrastructure. The Army intends to replace these legacy systems with Block III computers, aiming to further reduce size, weight, and cost while enhancing performance and maintainability.
The modernization effort focuses on transitioning to an All-In-One (AIO) or Smart Display solution for most wheeled platforms, replacing both the processor/display configuration (MFoCS Intermediate) and tablet-based systems (MFoCS Basic) used in Logistics and Tactical Operations Centers (TOCs). For integrated/firing platforms, the plan includes upgrading the current “headless” processor unit to a more powerful and capable version.
Key Requirements and Objectives:
The RFI outlines a comprehensive set of topics for industry response, including:
- Opportunities for size, weight, power, and cost savings with AIO computers.
- Compatibility with existing MFoCS Block I/II installation kits and potential need for adapter cables.
- Innovative approaches to maintain backward compatibility while reducing footprint.
- Thermal and power management concerns for AIO form factors.
- Supply chain risks and mitigation strategies.
- Cost reduction methods without sacrificing compatibility.
- Strategies for mitigating hardware obsolescence and maintaining a stable configuration baseline.
- Microprocessor selection to balance computing demands, heat management, and future scalability.
- Approaches to meet stringent military environmental requirements (shock, vibration, temperature extremes, water ingress, nuclear, chemical, and biological decontamination).
- Battery management solutions, including elimination or user-replaceable CMOS batteries.
- Evaluation of internal versus external GPS solutions.
- Identification of potential off-the-shelf computer solutions suitable for Block III.
- Sustainment rates for production lines and schedules for First Article Testing and initial deliveries.
- Cost drivers for rugged tactical computers and anticipated unit costs across a range of production quantities (from 1 to 15,000+ units).
Expected Deliverables:
Respondents are expected to provide detailed written feedback addressing each of the outlined topics, including technical, production, and cost considerations. All technical data shared as part of this RFI is classified as Controlled Unclassified Information (CUI); contractors must complete a CUI Non-disclosure form prior to receiving any technical documentation. Export-controlled information will only be distributed to eligible U.S. Government contractors with a valid Department of Defense Form 2345.
Contracting Entity and Location:
The contracting office for this RFI is W6DR PEO C3N, a federal entity located at Aberdeen Proving Ground, Maryland (MD), United States. The primary point of contact for this opportunity is James M. Mabrey, who can be reached at [email protected].
Procurement Type and Special Considerations:
This notice is issued as a SOURCES SOUGHT and is strictly for market research and planning purposes. It does not constitute a solicitation or a commitment by the Government to procure any items or services, nor will the Government pay for information submitted in response. All responses and technical documentation must be submitted via encrypted DoD SAFE drop. The RFI is open to eligible U.S. contractors, with additional requirements for handling CUI and export-controlled information.
Submission Details:
- All responses must be received no later than 1700 EST on 26 April 2024.
- Questions regarding the RFI should be directed to the primary contact by COB 10 April 2024.
- The Government may follow up with individual vendors for additional information after reviewing submissions.
Constant Elements:
Throughout the contract lifecycle, the focus will remain on delivering ruggedized, modular computing solutions that meet stringent military standards for environmental durability, interoperability, and maintainability. Backward compatibility, supply chain resilience, and obsolescence management will be critical to sustaining long-term operational effectiveness.
For further details and to access the official notice, contractors may refer to the SAM.gov opportunity at https://sam.gov/opp/017266cb4a97453e8f03683008fe53bb/view.
This RFI represents a significant opportunity for industry partners with expertise in ruggedized military computing hardware, modular system design, and large-scale production to help shape the next generation of mission command technology for the U.S. Army.