Carl B. Stokes U.S. Courthouse Plaza Replacement Design Build Services
Key Dates
Due Date
-
Posted Date
-
Agency & Value
Agency
PBS R5 ACQUISITION MANAGEMENT DIVISION
Contract Value
Not provided
Codes & Classification
Solicitation Number
47PF0024R0073
NAICS
236220 - Commercial and Institutional Building Construction
Classification Code
Y1AA
Additional Details
The General Services Administration (GSA), through its Design Excellence Program, has issued a solicitation for Design-Build services to undertake a comprehensive plaza replacement at the Carl B. Stokes U.S. Courthouse in Cleveland, Ohio. This initiative, funded under the Inflation Reduction Act, is part of GSA’s broader mission to modernize and maintain legacy federal buildings, ensuring their continued service for the next 50 to 100 years. The project seeks to exemplify integrated design that honors the historic significance of federal properties while meeting contemporary needs for aesthetics, cost-effectiveness, constructability, reliability, and environmental responsibility.
The scope of work for this Design-Build contract encompasses all labor and materials necessary for the replacement of the failing waterproofing system, refinishing and reinforcement of the structural steel supporting the plaza, repairs to fireproofing, and the completion of an unconstructed plaza area originally intended for the site. Additional upgrades include improvements to surface parking lots and the retaining wall. The new construction is designed to enhance pedestrian access, particularly from the Detroit-Superior bridge and the adjacent mixed-use warehouse district, while reconciling accessibility with existing parking infrastructure.
A key objective of the project is to introduce sustainable features, such as renewable energy sources and a water reclamation system, leveraging the site’s unique wind opportunities and alleviating pressure on the city’s stormwater system by capturing rainwater beneath the plaza. The project will be executed in accordance with GSA’s quality standards, performance targets, and security requirements, as mandated by applicable laws, regulations, and Executive Orders. The procurement also incorporates the Art in Architecture Program and adheres to GSA’s policies for Design, Construction, and Operational Excellence.
The procurement follows the Federal Acquisition Regulation (FAR) Two-Phase Design-Build Selection Procedures. Phase I involved a request for qualifications, from which the most highly qualified offerors were shortlisted to participate in Phase II, the request for proposals. In Phase II, shortlisted firms are required to submit both technical and price proposals, which are evaluated separately in accordance with FAR Part 15. GSA has publicly announced the three shortlisted firms for this project:
- Bulley & Andrews/KSP (Chicago, IL)
- Dawn|Higley/MKSK (Warren, OH)
- F.H. Paschen/EXP/Site Design Group (Chicago, IL)
At the conclusion of Phase II, a single contract will be awarded for all design and construction services. The procurement is full and open, with no set-aside restrictions, inviting participation from all qualified businesses.
The project is classified under NAICS Code 236220 (Commercial and Institutional Building Construction), with the Product Service Code Y1AA (Construction of Office Buildings). The place of performance is Cleveland, Ohio.
The contracting entity for this opportunity is the PBS R5 Acquisition Management Division, a federal office within the General Services Administration’s Public Buildings Service. The primary point of contact is Gregory Oprian ([email protected], 312-405-6905), with Timothy Novak ([email protected], 773-590-2850) serving as the secondary contact.
A virtual pre-proposal meeting was scheduled for September 30, 2024, and proposals were due by October 28, 2024. Amendments to the solicitation and related documents have been issued and are available for review.
This opportunity represents a significant investment in the modernization and sustainability of federal infrastructure, with a focus on design excellence, operational efficiency, and environmental stewardship. Contractors with expertise in large-scale, complex design-build projects—particularly those with experience in sustainable construction and public architecture—will find this project well-aligned with their capabilities.
Documents12