Temporary Wall Replacement at Denison Powerhouse, Denison, TX

Key Dates
Due Date

-

Posted Date

-

Agency & Value
Agency

W076 ENDIST TULSA

Contract Value

Not provided

Codes & Classification
Solicitation Number

W912BV24R0103

NAICS

236220 - Commercial and Institutional Building Construction

Classification Code

Y1QA

Additional Details
Set Aside

None

Place of Performance

-

SourceSAM
Documents3
The U.S. Army Corps of Engineers, Tulsa District (W076 ENDIST TULSA), has issued a solicitation for the Temporary Wall Replacement project at the Denison Powerhouse in Denison, Texas. This procurement seeks qualified contractors to undertake a comprehensive demolition and reconstruction effort within the powerhouse facility, with the overarching goal of enhancing structural integrity and operational safety. The scope of work encompasses several key activities: contractors will be responsible for the demolition and disposal of the existing temporary wall and its support structure, as well as the removal of the adjacent wood plank flooring and its supports at the Generator Room Level. Additional demolition tasks include the removal of miscellaneous elements such as railings and rebar. Following demolition, the contractor will design and construct a new floor grating system at the Generator Room Level and install a structurally independent permanent wall and support structure on the north side of the powerhouse. Notably, the permanent wall system must be designed and constructed so that it does not require any structural modifications to the existing powerhouse structure, preserving the integrity of the original facility. This solicitation is being conducted as a full and open competition for a Firm-Fixed Price (FFP) contract, awarded under the best value continuum using the Lowest Price Technically Acceptable (LPTA) process, in accordance with FAR 15.101-2. Contractors should be prepared to commence work within 10 days of receiving the Notice to Proceed (NTP) and must complete all work within a maximum of 730 calendar days from NTP issuance. The contract includes provisions for liquidated damages in the event of late completion, and both performance and payment bonds will be required to ensure project delivery and financial security. The project falls under NAICS Code 236220 (Commercial and Institutional Building Construction), with the Product Service Code Y1QA, indicating construction of restoration and repair of real property (public buildings). The solicitation has been updated multiple times through amendments (AM 0001 through AM 0013), which have addressed site visit scheduling, proposal due date extensions, inclusion of as-built drawings, updates to the Statement of Work (SOW), and the addition of optional bid items such as insulated metal panels and a hybrid wall panel system. Wage determination updates and additional technical documentation have also been provided to support proposal development. The contracting entity is the Tulsa District office of the U.S. Army Corps of Engineers, a federal government organization. Interested parties may direct inquiries to the primary point of contact, Cheyenne Redemann ([email protected], 918-669-7073), or the secondary contact, Shawn Brady ([email protected], 918-669-4984). This opportunity is currently active, with proposals due by April 30, 2025. Contractors considering this project should review all solicitation amendments and attachments available on SAM.gov (Opportunity ID: 92b3d5c9d6b840a7adf74e04d1075391) to ensure compliance with updated requirements and to fully understand the technical and administrative expectations. The project is well-suited for firms with demonstrated experience in commercial and institutional building construction, particularly those capable of complex demolition, structural design, and installation within operational power generation facilities. No set-aside requirements or special socioeconomic considerations are indicated in the notice. In summary, this solicitation represents a significant opportunity to contribute to the long-term safety and functionality of the Denison Powerhouse through the replacement of critical structural elements. Contractors should be prepared for a rigorous technical and administrative process, with clear deliverables and a defined timeline, under the oversight of the U.S. Army Corps of Engineers.