P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA
Key Dates
Due Date
-
Posted Date
-
Agency & Value
Agency
NAVFACSYSCOM SOUTHWEST
Contract Value
Not provided
Codes & Classification
Solicitation Number
N6247324R5227
NAICS
237130 - Power and Communication Line and Related Structures Construction
Classification Code
Y1NZ
Additional Details
The Naval Facilities Engineering Systems Command Southwest (NAVFACSYSCOM SOUTHWEST) has issued a solicitation for a Firm-Fixed Price (FFP) Design-Build contract, identified as P-1238, for the construction of grid stability and resiliency Battery Energy Storage Systems (BESS) at the Marine Corps Air Ground Combat Center (MCAGCC) in Twentynine Palms, California. This procurement seeks to enhance the installation’s energy resilience, grid stability, and operational efficiency through the integration of advanced battery storage technology.
The scope of work encompasses the design and construction of a total of 10 megawatts (MW) / 40 megawatt-hours (MWh) of BESS, distributed across two cogeneration sites: 6.0 MW / 24 MWh at site 1 and 4.0 MW / 16 MWh at site 2. Each BESS installation will consist of high energy density batteries, bidirectional inverters, and associated control systems, all configured as standalone modular packaged units. These systems will be strategically located in proximity to existing solar photovoltaic (PV) arrays, enabling direct connection for clean energy charging. Additionally, the BESS units will interface with the installation’s electric distribution system, supporting charging from utility power or on-site cogeneration sources.
A critical objective of this project is the integration of the BESS with the MCAGCC’s microgrid, which is concurrently being developed under project P-1232. This integration will allow the stored battery energy to be dispatched to mitigate solar PV output variability, stabilize the electrical distribution grid, and provide essential backup power during black-start and islanding events, thereby significantly enhancing the installation’s energy resilience. Furthermore, the BESS will contribute to energy management by reducing costs during periods of peak demand or high energy pricing. All control systems associated with the BESS will be accredited to maintain robust cybersecurity standards, ensuring the integrity and security of the energy infrastructure.
The contract is classified under NAICS code 237130 (Power and Communication Line and Related Structures Construction), reflecting the specialized nature of the work. The procurement is unrestricted and open to all qualified offerors, with no set-aside requirements specified. The place of performance is Twentynine Palms, California.
NAVFACSYSCOM SOUTHWEST, a federal office, is the contracting entity responsible for this solicitation. Interested parties may direct inquiries to the primary contact, Kathryn Cranford ([email protected], 619-705-4644), or the secondary contact, Jaime Flores ([email protected], 619-705-4873).
This opportunity is currently active, with a response deadline of August 8, 2025. Contractors considering this solicitation should possess demonstrated expertise in large-scale energy storage system design and construction, integration with renewable energy and microgrid systems, and compliance with federal cybersecurity accreditation requirements. The project’s deliverables are expected to remain consistent throughout the contract lifecycle, focusing on the delivery of fully permitted, operational BESS installations that enhance the MCAGCC’s energy security and operational efficiency.
For further details and access to solicitation documents, interested parties should refer to the official notice on SAM.gov (Opportunity ID: a7feb8077d0d409f8d1d80bf3b15b5e0).
Documents76