AZ FS 289(1) AZ NFSR 289 BRIDGE REPLACEMENT
Key Dates
Due Date
-
Posted Date
-
Agency & Value
Agency
6982AF CENTRAL FEDERAL LANDS DIVISI
Contract Value
Not provided
Codes & Classification
Solicitation Number
6982AF25B000019
NAICS
237310 - Highway, Street, and Bridge Construction
Classification Code
Y1LB
Additional Details
The Federal Highway Administration (FHWA), through its Central Federal Lands Division, has issued a solicitation for the AZ FS 289(1) AZ NFSR 289 Bridge Replacement project, located in the Tonto National Forest approximately 18 miles east of Payson, Arizona. This procurement seeks qualified contractors to undertake the replacement of the existing Tonto Creek Bridge (structure no. 031204000003356), originally constructed in 1956 as a single-lane, concrete slab bridge. The project is critical for improving access and safety along NFSR 289, a two-lane roadway serving residential communities, a fish hatchery, a summer camp, and numerous recreational sites and trailheads.
The primary objective of this project is to enhance pedestrian and vehicular safety and access by replacing the aging bridge, expanding the Horton Springs Parking Lot, and improving associated roadway infrastructure. The scope of work encompasses the reconstruction of a segment of Forest Road 289, complete removal of the existing two-span bridge and its pier, and construction of a new single-span bridge over Tonto Creek. The new bridge alignment will be situated east (upstream) of the current structure to minimize disruptions to public traffic during construction. Additional work includes channel grading within Tonto Creek, installation of a new sidewalk, and reconstruction of the Horton Springs Parking Lot to better serve the area's recreational users.
Key deliverables and principal work items include:
- Removal of the existing bridge structure
- Roadway and channel excavation totaling approximately 3,600 cubic yards
- Disposal of approximately 2,300 square feet of waste material
- Placement of 750 tons of roadway aggregate and 535 tons of asphalt concrete pavement
- Construction of 180 square yards of minor concrete pavement (6-inch depth)
- Installation of 252 cubic yards of structural concrete (Class A, air-entrained)
- Placement of 448 linear feet of precast, prestressed concrete box beams (Type B2-48)
- Installation of 14,200 pounds of reinforcing steel and 18,500 pounds of epoxy-coated reinforcing steel
- Erection of 162 linear feet of steel bridge railing
- Implementation of temporary stream diversion measures as required
The anticipated project timeline is as follows: advertisement in October 2025, contract award in December 2025, notice to proceed (NTP) in January 2026, and contract completion by October 2026. It is important to note that due to seasonal weather conditions, no onsite work is expected between January and April 2026.
The estimated cost range for this project is between $2,000,000 and $5,000,000. The procurement is classified under NAICS code 237310 (Highway, Street, and Bridge Construction) and Product Service Code Y1LB. There are no set-aside restrictions for this solicitation, making it open to all qualified contractors.
The place of performance is Payson, Arizona, within the United States. The contracting entity is the Central Federal Lands Division of the Federal Highway Administration, under the Department of Transportation. Interested parties may direct inquiries to the primary and secondary contacts, Stephanie Navarro and Kelly Palmer, via the shared email address [email protected].
This opportunity is currently active and further details, including attachments, can be accessed through the official SAM.gov listing at https://sam.gov/opp/c4ac3d7a1955421194b12e634e31f4ca/view. Contractors with expertise in bridge replacement, roadway construction, and related civil works are encouraged to review the solicitation documents and consider this significant infrastructure improvement project in the Tonto National Forest.
Documents15