The Federal Highway Administration (FHWA), under the Department of Transportation, has issued a solicitation for the "NM BR AAO EL VADO Heron & El Vado Road Rehabilitation" project, located in Tierra Amarilla, New Mexico. This procurement is being managed by the Central Federal Lands Division and is designated as a Total Small Business Set-Aside, providing an opportunity exclusively for qualified small business contractors under NAICS code 237310 (Highway, Street, and Bridge Construction).
The primary objective of this project is to rehabilitate and improve the surfacing and operational efficiency of key roadways and parking facilities within El Vado and Heron Lake State Parks. The scope of work is divided into a main schedule (Schedule A) and an optional component (Option X). Schedule A encompasses rehabilitation activities along State Park Road 5001 within El Vado State Park, while Option X covers access roads and parking lots primarily situated in Heron Lake State Park.
Key elements of the project include full depth reclamation (FDR) of approximately 5.23 miles of asphalt roadway—4.61 miles on State Park Road 5001 in El Vado State Park and 0.62 mile on the Willow Creek Boat Ramp Access Road in Heron Lake State Park. The FDR process will also be applied to three existing paved parking lots: the Heron State Park Visitors Center Parking Lot, the Willow Creek Boat Ramp Parking Lot, and the Ridge Rock Parking Lot (including its adjacent access road), all within Heron Lake State Park. Additionally, the project will pave an existing gravel parking lot in El Vado State Park.
The rehabilitation effort further includes curb removal, installation of new sidewalks, updated signage, pavement markings, and minor drainage improvements such as culvert cleaning. The principal work items and their approximate quantities are as follows:
- 78,000 square yards of Full Depth Reclamation with Cement (4-inch depth)
- 13,000 tons of Asphalt Concrete Pavement
- 75 tons of Prime Coat, Method 1
- 55 tons of Fog Seal
- 33 miles of Pavement Markings, Type B, Solid
- 500 cubic yards of Roadway Excavation
- 2,100 tons of Roadway Aggregate, Method 2
- 60 square yards of Concrete Sidewalk
- Cleaning of 15 culverts in place
The anticipated outcomes of this project are enhanced roadway durability, improved parking lot functionality, safer pedestrian access, and upgraded drainage systems within the state parks, thereby supporting both recreational access and long-term infrastructure resilience.
The solicitation is active, with plans and specifications available for review. Interested small business contractors are encouraged to review the full solicitation and attachments via the official SAM.gov opportunity listing (Opportunity ID: a33bdc12374b47bd9b2d1f58d7e74105). The primary point of contact for this procurement is Denise Martinez, who can be reached at [email protected] for further information or clarification.
Contractors considering this opportunity should note the federal nature of the contract, the specific small business set-aside requirement, and the comprehensive scope of work involving both roadway and ancillary infrastructure improvements. The place of performance is Tierra Amarilla, New Mexico, and all work must comply with the detailed plans and specifications provided by the FHWA Central Federal Lands Division.