RSA Primary Substation 4, Redstone Arsenal, AL

Key Dates
Due Date

-

Posted Date

-

Agency & Value
Agency

W074 ENDIST MOBILE

Contract Value

Not provided

Codes & Classification
Solicitation Number

W9127825R0020

NAICS

237130 - Power and Communication Line and Related Structures Construction

Classification Code

Y1JZ

Additional Details
Set Aside

None

Place of Performance

-

SourceSAM
The U.S. Army Corps of Engineers, Mobile District (W074 ENDIST MOBILE), has issued a solicitation for the construction of RSA Primary Substation 4 at Redstone Arsenal, Alabama. This procurement seeks qualified contractors to undertake a comprehensive high-voltage electrical infrastructure project, with the primary objective of enhancing the power distribution capabilities at Redstone Arsenal. The scope of work encompasses the construction of a new high-voltage electrical primary substation, including the installation of transmission lines that will interconnect the new facility with existing substations and accommodate a future connection to the Tennessee Valley Authority’s (TVA) planned 161,000-volt transmission feed. Key deliverables for this project include the substation itself, transformers, both primary and secondary voltage switchgear, a distribution loop, cable vault, control room, and all associated duct banks and cabling. The successful contractor will be responsible for delivering a fully integrated and operational substation that meets all specified technical and safety standards. This opportunity is classified under NAICS code 237130 (Power and Communication Line and Related Structures Construction), reflecting the specialized nature of the work in high-voltage electrical infrastructure. The Product Service Code (PSC) is Y1JZ, further indicating the focus on construction of miscellaneous buildings and facilities related to power distribution. The contracting entity is a federal office, specifically the Mobile District of the U.S. Army Corps of Engineers. Interested parties may direct inquiries to the primary contact, Ariel Chamberlain ([email protected], 251-690-2473), or the secondary contact, Stephanie Scalise ([email protected], 251-690-2478). The solicitation is currently active, with a posting date of February 4, 2025, and a response deadline of April 14, 2025. Contractors considering this opportunity should review the requirements in detail and assess their capabilities in high-voltage substation construction, transmission line installation, and related electrical infrastructure work. No set-aside requirements or special considerations are specified in the notice, and no attachments or additional documents are currently available via the provided SAM.gov link. This project represents a significant investment in the long-term electrical reliability and capacity of Redstone Arsenal, and contractors with proven experience in large-scale power and communication line construction are encouraged to evaluate their interest and submit a response within the designated timeframe.