Cape Cod Canal, Buzzards Bay, MA ? Painting and Steel Repairs, Vertical Lift Railroad Bridge

Key Dates
Due Date

-

Posted Date

-

Agency & Value
Agency

W2SD ENDIST NEW ENGLAND

Contract Value

Not provided

Codes & Classification
Solicitation Number

W912WJ25B0001

NAICS

238320 - Painting and Wall Covering Contractors

Classification Code

Y1QA

Additional Details
Set Aside

None

Place of Performance

-

SourceSAM
The U.S. Army Corps of Engineers, New England District, has issued a solicitation for comprehensive painting and steel repair services at the Vertical Lift Railroad Bridge spanning the Cape Cod Canal in Buzzards Bay, Massachusetts. This project, identified under procurement number W912WJ25B0001, is classified within NAICS code 238320 (Painting and Wall Covering Contractors), and is open to all qualified bidders without restriction. The primary objective of this procurement is to restore and preserve the structural integrity and operational reliability of the historic Vertical Lift Railroad Bridge, originally constructed in 1935. The bridge is a critical infrastructure asset, supporting both freight and passenger rail traffic across the canal. It features a three-span configuration, including a central moveable lift span flanked by two approach spans and towers rising to 257 feet. The main lift span measures 544 feet in length and, when raised, provides a vertical clearance of 136 feet above mean high water, ensuring uninterrupted vessel navigation below. The scope of work encompasses the complete blast cleaning of all bridge metalwork down to bare steel, followed by the application of a high-performance, three-coat paint system. Surface preparation will adhere to industry standards, including solvent cleaning (SSPC SP 1) and commercial blast cleaning (SSPC SP 6/NACE No.3). Contractors are expected to comply with USACE safety and environmental requirements, as outlined in EM-385-1-1, particularly regarding abrasive blasting, air monitoring, and containment procedures. In addition to painting, the contract includes targeted steel repairs at the towers and center span. Due to the bridge’s moveable design, maintaining proper balance throughout the project is essential. Any use of equipment or tools that could affect the span’s equilibrium will require the installation of balance blocks on the bridge counterweights, as furnished by the contractor. Operational continuity is a key requirement. The navigation channel beneath the bridge must remain open at all times, and the bridge itself must remain fully functional to accommodate daily scheduled train crossings. The Mass Coastal Railroad utilizes the bridge for waste transport six days a week, while the Massachusetts State passenger rail service operates on weekends during the summer, necessitating bridge lifts approximately six times weekly from June through September. As such, contractors must be prepared for significant coordination with the MBTA, Mass Coastal Railroad, and the Cape Cod Canal Marine Traffic Controller to ensure seamless sequencing of work and minimal disruption to rail and marine traffic. The anticipated period of performance for this project is approximately 545 days, with an estimated contract value ranging from $10,000,000 to $20,000,000. The project is managed by the U.S. Army Corps of Engineers, New England District (W2SD ENDIST NEW ENGLAND), a federal office. Interested parties may direct inquiries to the primary contact, Brian Mannion ([email protected], 978-318-8478), or the secondary contact, Erin Bradley ([email protected], 978-318-8195). This opportunity is currently active, with a response deadline of March 12, 2025. Additional details, including solicitation attachments, are available via the official notice on SAM.gov (Opportunity ID: c29bb69a1b4943cbb39086734b514861). Contractors considering this opportunity should possess demonstrated expertise in large-scale steel structure painting and repair, experience with complex coordination in active transportation environments, and a commitment to safety and environmental compliance. The project’s requirements and operational constraints will remain consistent throughout the contract lifecycle, making thorough planning and stakeholder engagement essential for successful execution.
Documents24